Drilling a lateral extension to a vertical well with 1.75% PDS Super L in an 800 bbl system.
- Experienced 20-35% increase i ROP with PDS Super L in the system, despite mechanical issues (unrelated to mud system) that required less aggressive drilling.
- Reduced differential pressure by ~250 psi.
- 10-12k lb reduction in pick-up weight.